Waikato

64 Gargan Road

64 Gargan Road Overview 64 Gargan Road in Tauriko was a design and build project, with Fosters engaged at the design stage and managing the project through to consent. With a focus on efficient construction, the 2,600sqm workshop and office structure comprised strip foundations, precast panels, and structural steel portals, with the concrete slab poured […]

64 Gargan Road Read More »

Fully Equipped

Fully Equipped Overview A project involving Fosters maintain and engineering teams, Fosters is proud to have delivered a modern and functional new lunchroom and new ablutions to accommodate the expanding team at the Fully Equipped Hamilton head office. The refurbishment project timeframe was approximately 5 months, including demolition of the existing facilities. Engineering supplied made-to-measure

Fully Equipped Read More »

Convex

Convex Overview Designed to consolidate the company’s administrative offices, laboratory/manufacturing plant, and warehouse into a more efficient streamlined working environment, the new Convex head office is located on the Kahikatea Drive side of the Convex complex in Hamilton. It replaces the company’s former administrative building – which would have required extensive recladding to remediate escalating

Convex Read More »

Mainstream

Mainstream Overview Hamilton transit freight facility in Chalmers Road – a purpose-built warehouse hub for receiving and distributing freight around the Waikato. Completed in just 5 months, the 2,400m² warehouse was constructed with clean span CWB structural steel and precast concrete panels. A compact 158m² office block sits alongside the warehouse. About the project Features

Mainstream Read More »

Cambridge Museum

Cambridge Museum Overview The Cambridge Museum was built in 1909 and used as a courthouse before being converted into the museum in 1984. Fosters maintain team recently completed structural and seismic strengthening work, mainly to the building façade and roof. At the same time, a new 140m² roof was fitted with new gutters and timber

Cambridge Museum Read More »

NIWA

NIWA Overview Purpose-built environmental research complex for NIWA, situated at the University of Waikato. About the project This PC1 project involved the delivery of highly serviced laboratory environments, including PC2 containment facilities. The project was also delivered to 5 Green Star principles, incorporating sustainable design, rainwater harvesting, and energy-efficient building performance. Four separate buildings were

NIWA Read More »

Greengrower I Waikato Innovation Park

GreengrowerWaikato Innovation Park Overview Located within Waikato Innovation Park’s 17-hectare Ruakura campus, this 5,900m² purpose-built facility was New Zealand’s first large-scale vertical farm. Operated by horticulture company Greengrower, the fully automated facility grows leafy greens in stacked layers, from seed to harvest, using 95% less water and significantly less energy than conventional methods. About the

Greengrower I Waikato Innovation Park Read More »

Tamahere Physiotherapy

Tamahere Village Overview Foster Construction were engaged by Foster Develop and the Waikato District Council to construct Tamahere Village – a community-focused commercial and recreational space for the growing suburb located south of Hamilton. This thoughtfully designed development is a fantastic example of how collaboration creates successful outcomes. Waikato District Council engaged Foster Construction to

Tamahere Physiotherapy Read More »

Vetro Mediterranean Foods

Vetro Mediterranean Foods Overview Building renovation and fitout, creating an upmarket, architecturally designed space with an industrial finish. The renovation of this Rostrevor Street building was extensive, with the entire building gutted and reshaped. A new kitchen and office area were added and the existing concrete floors polished. Foster Engineering made and installed the new

Vetro Mediterranean Foods Read More »

APL Hautapu

APL Hautapu Overview Designed to accommodate APL’s 50+ year strategy, this was an approximately 50,000sqm industrial facility, purpose-built to house a state-of-the-art glass manufacturing plant. The project achieved a 5-star Green Star industrial design rating. Measuring 437m long, 144m wide, 17m high, the facility was designed around end-to-end manufacturing, efficient delivery, and dispatch by a

APL Hautapu Read More »

Scroll to Top