Current Projects
Some of the projects we are currently working on
With property development, construction, engineering and property maintenance specialist teams on the job daily, we have several projects on the go at any one time.
Check out what we’re working on!
Waikato

116-118 Hukanui Road
Kāinga Ora
A Foster Residential Project - this includes 10 new units:
- 6 one-bedroom three-level walk up units
- 4 two-bedroom terrace units
Completion Date

Q4 - 2024
Contract Value

$4.3M

Hampton Downs
Hampton Downs
Refurbishment of an existing kitchen, new toilet block. Redevelopment of existing office.
Completion Date

Q4 - 2024
Contract Value

$800k

Kinfields Stage 2
North City Road
Stage 2 of the Kinfields Development at Rototuna Village. This design-build project adds 4 new blocks to the village.
Completion Date

Q1 - 2025
Contract Value

$6.9M

Kohia
Kohia Drive, Horotiu
A 14,000sqm warehouse and breezeway, with small office space.
Completion Date

Q4 - 2024
Contract Value

$15.5M

One School Global
4 Eureka Road, Eureka
Design and build and redevelopment of existing school administration and student learning spaces. Combination of new build and fitout.
Completion Date

Q2 - 2025
Contract Value

$6.1M
RML
Overview
Fosters partnered with Chalmers Properties to deliver a new building for RML, going from concept to completion within 15 months. The brief required a flexible, future-proofed facility to meet RML's operational demands.
RML specialise in machinery and robotics development. This purpose-built facility was developed to support their growing operations, with specialised spaces for manufacturing, testing, and research.


About the project
The project involved the design and construction, plus specialised fitout, of a warehouse and 2-storey office block at Te Rapa Gateway. The complex includes concrete yards and a permeable concrete carpark, further enhancing its functionality.
Coordinating basebuild and fitout, while integrating RML as a contractor for their own fitout work, required careful planning and communication. Furthermore, a tight budget was paired with a high-spec brief, so cost management was critical throughout.
The project was delivered one week ahead of schedule and under budget, a testament to the team's dedication and the successful partnership between Fosters, Chalmers and RML.

2024

5,400m2

$6.5M
Client testimonial
For RML CEO Daryl Joyce, the decision to partner with Chalmers Properties and Fosters on the design-build and fitout was the right one.
“We’re very thankful we had Chalmers and Fosters alongside us” he said. “Partnering with them wasn’t a decision we made lightly, we started out with three options. It was (Chalmers Properties CEO) David Chafer’s faith in Fosters’ ability to understand and deliver on our requirements that was the deciding factor.”
Whilst the building was architecturally designed, Daryl notes that RML defaulted to Fosters on buildability.


“Fosters quickly grasped what we wanted to achieve and gave excellent advice on how best to work within our budget,” said Daryl.
“They are a very professional organisation; their systems and processes exceptional; their team accommodating and readily available. And they were always conscious of time, which was important to us.”
The project timeframe was 15 months from concept to completion, including design, consent, construction, and compliance.
“Fosters delivered ahead of time, which was impressive” he added.
“We appreciate time can slip away, affecting a team’s ability to deliver on programme. Not this time; being on time for our own delivery was great.
“The value of working with Fosters is they have the best contacts and deliver a great project. We couldn’t fault them.
“Looking to exceed expectations, they never lacked in delivery, which aligned well with our own values. I would certainly work with them again.”

“Fosters quickly grasped what we wanted to achieve and gave excellent advice on how best to work within our budget.”
Daryl Joyce, CEO RML
Have a similar project in mind?

Te Whatu Ora (Waikato DHB) Renal Centre
Pembroke Street, Hamilton
This project includes the construction of a two-storey medical facility for renal treatments at the Waikato Hospital. Total floor area of 3131m².
This is a Greenstar project.
Completion Date

Q2 - 2024

Union Square
Corner Alexander St + Hood St, Hamilton
A dynamic development at the south-end of Hamilton’s CBD, creating premium A-grade office space and commercial opportunities.
Contract Value

$100-120M

Waikato Regional Theatre
Victoria Street, Hamilton
Embracing 100+ years of history, this project is converting the old Hamilton Hotel into a state-of-the-art theatre in Hamilton’s Central Business District.
Completion Date

2025
Contract Value

$65M
Bay of Plenty

65 Durham Street
65 Durham Street, Tauranga
A 6-month staged refurbishment project for the owners of 65 Durham St. We have been engaged to upgrade the ablutions, kitchens, and entry foyer, including replacement of ceiling tiles and lighting throughout. We have also undertaken a structural upgrade on the first floor.
Completion Date

Q3 - 2024
Contract Value

$1.1M

Harvard Industrial Development
14 Harvard Way, Mt Maunganui
New two tenancy industrial warehouse with associated offices located in Mount Maunganui.
Completion Date

Q2 - 2025
Contract Value

$8.8M

New World Kawerau
Seismic upgrade and refurbishment.
Completion Date

Q2 - 2025
Contract Value

$850K

Repco Tauranga
This project includes the Seismic Strengthening of an existing building, updating the current office spaces and roller doors.
Completion Date

Q3 - 2024

Southpac Group Office
100, First Avenue, Tauranga
A high-end commercial fitout in Tauranga's CBD. Scope of works include a full interior fitout, seismic upgrade, maintenance of the roof and gutters, and some exterior works.
Completion Date

Q4 - 2024
Contract Value

$1.5M

Tauranga Crossing Stage 3
The Crossing Tauriko
Expansion of the existing shopping Centre on two levels to provide additional speciality shops and large department store, plus public service areas.
Completion Date

Q3 - 2025
Contract Value

$27.5M

Western Heights High School
Redevelopment of Te Maru Special Needs Unit. Includes demolition of current facility with construction adding a new 6m teaching space to the learning support centre.
Completion Date

Q1 - 2026
Contract Value

$7.1M

Whakatane High School
Block H & G weathertight remediation work (MOE).
Completion Date

Q2 - 2025
Contract Value

$400k

Whakatane High School
Block T & X weathertight remediation work (MOE).
Completion Date

Q1 - 2025
Contract Value

$650K

Woodlands School
Weathertight remediation work (MOE).
Completion Date

Q3 - 2025
Contract Value