A project involving Fosters maintain and engineering teams, Fosters is proud to have delivered a modern and functional new lunchroom and new ablutions to accommodate the expanding team at the Fully Equipped Hamilton head office.

The refurbishment project timeframe was approximately 5 months, including demolition of the existing facilities. Engineering supplied made-to-measure structural steel beams for the alterations, enabling the addition of a cantilever first floor lunchroom. Finished to a high spec with feature plywood walls and ceiling with contrasting black aluminium balustrades and screens, this lunchroom extends seamlessly outdoors through large sliding doors to a deck area.

fully-equipped-1
fully-equipped-2

About the project

Ground floor work included demolition of the existing ablutions, modernising male and female bathrooms and changing rooms, and adding an easily accessible extra lunchroom area for factory staff.

Work was done while the site remained operational. A temporary internal shrink-wrapped wall was added during construction – separating the construction area from the factory to minimise dust contamination.

A close working relationship between the Fully Equipped team and Fosters was key to the success of this project.

Completion date

2023

area_icon@2x

150m2

cost_icon@2x

$588k

Client testimonial

According to Fully Equipped Executive Manager Kayne Scott, Fosters was chosen for the job based on a long-standing family relationship. “We’ve always enjoyed good outcomes working with Fosters” he said.

“We rate them highly and I had high expectations – which they met.”

The Fully Equipped refurb project took place over a period where Kayne was frequently unavailable for site meetings.

fully-equipped-4
fully-equipped-5

“Fosters pretty much ran the project on their own, there wasn’t much input required from me. They took the lead and drove it forward.”

Experience, professionalism and providing practical solutions are the strengths that Kayne identifies with Fosters.

“Building renovations are never easy” Kayne said. “We undertook a major refurb of an existing structure, coupled it with a new section and we weren't quite sure what to expect.

“Fosters made it easy, delivering a quality outcome within budget. I wouldn’t hesitate to use them again, or to recommend them.”

fully-equipped-8
fully-equipped-7

“Fosters made it easy, delivering a quality outcome within budget. I wouldn’t hesitate to use them again, or to recommend them.”