Waikato

Kinfields Village Rototuna – Stage 2

Kinfields Village Rototuna – Stage 2

Kinfields Village RototunaStage 2 Overview 11 new retail units for one of Hamilton’s fastest-growing suburbs. Invested in producing good long-term outcomes for the Rototuna community, stage two (adding blocks 2 and 3 of 4) of the Kinfields Village development adds a breadth of retail and complementary services to this growing location. About the project Designed […]

Kinfields Village Rototuna – Stage 2 Read More »

Dairy Goat Co-operative Store 8

Dairy Goat Co-operative Store 8

Dairy Goat Co-operativeStore 8 Overview Purpose-built warehouse specifically designed for the storage of goat milk powder, requiring specialist consideration for structural performance and operational continuity. The Dairy Goat Co-operative were the first to develop goat milk into infant formula. The milk is sourced from New Zealand farms, dried, packaged and sent to 30 countries around

Dairy Goat Co-operative Store 8 Read More »

Hilton Brown Swimming Pool, Te Rapa

Hilton Brown Swimming Pool, Te Rapa

Hilton BrownSwimming Pool Overview The Hilton Brown Te Rapa complex consists of a 900m² building with a 20m long indoor pool purpose-built for swimming lessons. Being a straight tender, Fosters had no input into the design of the project but building a commercial ‘learn to swim’ pool included a complicated mechanical system and specialist pool

Hilton Brown Swimming Pool, Te Rapa Read More »

Waikato Regional Renal Centre

Te Pureoranga – Waikato Regional Renal Centre

Te PureorangaWaikato Regional Renal Centre Overview Excavation and construction of a cutting-edge kidney dialysis hospital servicing the Waikato Region; also, the largest integrated renal service building in Australasia. Completed in just 16 months, the three-storey, purpose-built facility was delivered ahead of schedule, on budget, and with zero defects, enabling Health New Zealand – Te Whatu

Te Pureoranga – Waikato Regional Renal Centre Read More »

Gallagher Insurance

Gallagher Insurance

Gallagher Insurance Overview High-End Office Fitout for Gallagher Insurance, Hamilton. Gallagher Insurance are one of the world’s top three insurance brokerage and risk management companies, operating in more than 130 countries. Formerly known as Crombie Lockwood in New Zealand, the company supports around 160,000 clients through 30 offices and a team of 1,000 brokers. About

Gallagher Insurance Read More »

Kāinga Ora Hukanui Road

Kāinga Ora Hukanui Road

Kāinga Ora Hukanui Road Overview Walk-up apartment style units and duplex units to accommodate 10 families. This housing project provided modern homes for 10 families. The development included two distinct housing types: six single-bedroom apartments in a walk-up-style building, and four two-bedroom duplex (terrace) units designed for family living. About the project The two ground-floor

Kāinga Ora Hukanui Road Read More »

JP-Marshall

JP Marshall

JP Marshall Overview Purpose-built double-storey office block, designed and built as a statement of the company’s investment in engineering and innovation. JP Marshall (JPM) Engineering are experienced steel fabricators and industrial engineering providers. With services including design, fabrication and machining, their site covers five workshops and 90+ staff. About the project This office project ticked

JP Marshall Read More »

Visy Board Manufacturing Facility

Visy Board Manufacturing Facility

Visy Board Manufacturing Facility Overview Large-scale, purpose-built manufacturing facility for Visy New Zealand at Hamilton Airport, designed to support their cardboard production operations. The 8.5 hectare site doubled Visy NZ’s corrugated cardboard box making capability, featuring some of the world’s most innovative technology used in the manufacture of corrugated cardboard products. About the project Completed

Visy Board Manufacturing Facility Read More »

Activate Church

Activate Church Overview Refurbishment of an industrial factory warehouse/office space to create a modern community church, including a 290-seat auditorium. This transformation project, delivered by Foster Maintain, happened within a five-month timeframe. About the project Early contractor involvement enabled Fosters to work with the architects through the design stage, influencing buildability and value-engineering materials to

Activate Church Read More »

The Molecular Biology Laboratory

The MolecularBiology Laboratory Overview The Molecular Biology Laboratory, which began in a tiny area in the ‘90s, started off processing 12,000 tests per year. It now processes over 10,000,000 tests per year – marking the dire need for an upgrade. Successful delivery of this highly complex two-year project for Health New Zealand – Te Whatu

The Molecular Biology Laboratory Read More »

Scroll to Top