Current Construction Projects
Here are some of the construction projects we are working on across the Waikato and Bay of Plenty.
With property development, construction, engineering and property maintenance specialist teams on the job daily, we have several projects on the go at any one time.
From education and health to commercial and industrial construction projects, we take a lot of pride in 'making it happen' - delivering quality builds, on time and on budget.
Waikato
APL Office C Fitout
Hautapu
Completion of the final office area in the main APL facility, adding shared offices, plus staff café on the ground floor, and offices for Profile Group on level one.
The shell for this block was constructed in 2019 as part of the APL Hautapu basebuild project.
Completion Date
Q3 - 2025
Asmuss
Development of 3ha site, construction of 5,200sqm purpose-built manufacturing facility and 243sqm office. Remaining site developed into storage yards.
Completion Date
Q2 - 2026
Aurora Duplex
Hamilton
Architecturally designed three-bedroom double-storey residential duplex, total 300sqm footprint. Features include BGC cladding, cedar timber and brick. Bespoke A-frame structural portals crafted and installed by Foster Engineering.
Completion Date
Q3 - 2025
Marian Catholic School
Architecturally designed project of 6 two-storey classrooms and ablutions block. Featuring conventional weatherboard cladding, concrete flooring, steel portal design and timber framed ground floor. Off the build are covered walkways connecting into existing classroom blocks.
Completion Date
Q4 - 2025
One School Global
4 Eureka Road, Eureka
Design and build and redevelopment of existing school administration and student learning spaces. Combination of new build and fitout.
Completion Date
Q2 - 2025
Real Steel
Hautapu Industrial Park
7,700m² state-of-the-art steel processing facility in Hautapu Industrial Park. Designed for optimum flow, sustainability, and innovation, this new facility will house some of the largest and most advanced steel processing machinery in the country.
Completion Date
Q1 - 2026
Sime Darby
Large warehouse with specific workshop pits for working on trucks, large concrete yard and two-storey office block.
Completion Date
Q4 - 2025
Union Square
Corner Alexander St + Hood St, Hamilton
A dynamic development at the south-end of Hamilton’s CBD, creating premium A-grade office space and commercial opportunities.
University of Waikato Student Accommodation
Knighton Road, Hamilton
Two and three-storey townhouse-style apartment buildings, adding another 75 student rooms to the University accommodation portfolio. Total footprint: 2,002sqm of unit floor space for the three buildings over three floors.
Completion Date
Q1 - 2026
Waikato Regional Theatre
Victoria Street, Hamilton
Embracing 100+ years of history, this project is converting the old Hamilton Hotel into a state-of-the-art theatre in Hamilton’s Central Business District.
Completion Date
2025
Whitehall Fruitpackers
Karapiro
Tender project. Architecturally designed building: two-storey office block, with a single storey fitness block for a combined total of 1,122sqm. The entire site is 5,418sqm and will feature car parking, exterior lighting, a bus bay for tourists to visit. The building is clad in vertical Cedar timber weatherboards, metalcraft Kahu cladding, Te Kuiti limestone with a custom mesh aluminium rainscreen. Special features include a large 90sqm heated internal pool, bespoke wall finishes, semi-commercial kitchen, Cremer lift, rainwater harvesting system, and a large solar panel system.
Completion Date
Q2 - 2026
Bay of Plenty
Fairhaven School
Te Puke
Part of MOE Weathertightness Remediation Programme (WRP). Working in four stages (to limit the impact of losing classrooms for the construction works), work includes roof and cladding replacement, and any other work required in classrooms.
Completion Date
Q4 - 2025
New World Kawerau
Seismic upgrade and refurbishment.
Completion Date
Q2 - 2025
Open Country Stadium
Matamata
Design and build project. Purpose built sports facility including 2 x basketball courts, 2 x netball courts, multiple volleyball, badminton, and futsal court. Changing facilities attached, plus community zone with ablutions, multi-purpose room and kitchen. Ground floor and viewing gallery total 2,368sqm.
Completion Date
Q1 - 2026
Tauranga Crossing Stage 3
The Crossing, Tauriko
Expansion of the existing shopping Centre at the north-east end. Construction footprint totals 8,100sqm across two levels – to provide additional speciality shops and large department store, plus public service areas.
Completion Date
Q3 - 2025
Western Heights High School
Redevelopment of Te Maru Special Needs Unit. Includes demolition of current facility with construction adding a new 6m teaching space to the learning support centre.
Completion Date
Q1 - 2026
Whakatane High School
Block H & G weathertight remediation work (MOE).
Completion Date
Q2 - 2025
Woodlands School
Weathertight remediation work (MOE).